Manufacturing Procedure

01
icon
Contract

Specifications, functional design

  • Structure identification
  • Material and performance check
  • Chassis, material suitability
02
icon
Material Ordering, Receipt

Foreign and processed and general materials

  • Check the report
  • Material Specification
  • Contrast with contract specification
03
icon
Main product production

Frame and structure

  • Storage containers
  • Filter container, hose reel
  • Lifts, Outtriggers
04
icon
Assembly and mounting

Q.C inspection

  • PC’S No
  • Shape
  • Size
  •  
05
icon
Control panel Assembly

Panel and main part

  • Hydraulic line and Operation part
  • Pneumatic lines and valves
  • Sensing line and VCFS
  • Electric line and control part
06
icon
Painting, Unit assembly

Main part 1st deadline

  • Pre-treatment, and bottom coat, top coat
  • Assembling hose and nozzle
  • Fire extinguisher, stickers
  •  
07
icon
Product inspection

Completion inspection

  • Appearance and function
  • Contract specification
  • Standard inspection
  • FLOW TEST
  • Operation inspection
08
icon
Correction

Modification review after test

  • System check
  • Hydraulic pressure, sensing, electricity
  • Structure assembly
  • Operation part interference
  • Final inspection before shipping
09
icon
Education and inspection

Q.C & customer inspection

  • Review of contract specifications
  • Manual and textbook
  • Additional check
  •  
  •  
10
icon
Ready to ship

Final deadline

  • Subsidiary material packing
  • Spare tires, tools
  • Preparation for delivery
11
icon
Delivery, shipment

Inland, sea

  • Insurance and shipping conditions
  • BL and terms of delivery
  • Other local conditions
12
icon
Commissioning, follow-up management

On-site inspection, After-sales service

  • Appearance and operation test
  • Product performance test
  • User special conditions